Home
Back

Aravete heat network

Client: Aravete Biogaas / Year of completion: 2012

A heat pipeline was built which connects the first heat and power cogeneration plant based on bio fuel in Estonia (located in Mägise village) and a liquid fuel boiler house located in Aravete hamlet.

The total length of the heat pipeline was 1250 m, diameter: DN 150.

 

DSC_0726d4cc2b35d58a0e42c338ef51f6c6105554ad993ddf44b55073ff7149790b7d52_full