Home
Back

A sprinkler system for the oil shale supply system of Enefiti-280

Client: AS Eesti Energia Oil Plant / Year of completion: 2012

An automatic fire-fighting system for the oil shale supply system of Enefit-280 was designed and built. The total length of the pipelines was 6 km.

250807_390338921022435_1689006444_n

IMG_1205

10152471_706330759423248_1119571433739830020_n